TRON 2 DOCS
Products/TRON 2/Get started
TRON 2 · DOCUMENTATION

Your first two hours

Two hours from an assembled, wired robot to a working VLA example: check wiring → power on → basic teleoperation → deploy and run the project.

Robot assembly and initial wiring are completed before this session and are outside the two-hour scope. Inference software setup and project deployment belong to step 4. The current example is pi05 candy delivery for a compatible dual-arm EDU configuration.

Check your configuration

10 + 15 + 10 + 85 = 120 minutes · planning target, pending hardware timing

Four onboarding steps

Progress 0 / 4
Saved on this browser

Check wiring before power-on

10 min

Start with an assembled, wired robot. Check power and communication connections for your configuration.

Open guide

Power on

15 min

Follow the matching power-on sequence; confirm status lights and controller connection.

Open guide

Try basic teleoperation

10 min

Connect VR, try slow follow motion and gripper control, then return to idle for deployment.

Open guide

Deploy and run a simple VLA project

85 min

Use the published pi05 candy-delivery weights: set up inference, configure the robot, start server/client and complete a delivery trial.

Open guide

What counts as complete?

Complete wiring checks, power-on and basic teleoperation, then deploy the VLA example and verify a model-driven candy delivery. A running server alone is not enough. Use published weights; collecting a dataset and training a model are follow-up work. Stop the inference client after the trial and follow the safe return/shutdown procedure.

Open the detailed guide

Robot not assembled yet? Complete installation before starting the clock.

NEXTDual arms · first teleoperation